WI / CAIs


SNo.
Description
Document No.
1 W. I. of continuity & high voltage test for LHB EOG Non AC coaches. EDW0024, Ver-1.0
2 W.I. of continuity & high voltage test for LHB EOG AC coaches. EDW0025, Ver-1.0
3 W.I. of roof pre-ceiling & end wall clearance for LHB EOG AC Coaches. EDW0028, Ver-1.0
4 W.I. for under frame clearance for LHB EOG AC Coaches & Non AC Coaches. EDW0029, Ver-1.0
5 W.I. for setting of MPCB’s in SBC for various Electrical Equipments for LHB Coaches. EDW0030, Ver-1.0
6 W.I. for Average illumination tests and tests for uniformity of illumination  for LHB EOG coaches. EDW0032, Ver-1.0
7 W.I. for temperature rise testing of LED light fittings for LHB Coaches. EDW0032, Ver-1.0
8 W.I. for Voltage drop test for LHB EOG Coaches. EDW0033, Ver-1.0
9 W.I. for Tightening torque of hardwares for under frame mounted equipments in LHB AC & Non AC Coaches. EDW0035, Ver-1.0
10 W.I. for conduiting of cables to RMPU through final element for LHB EOG AC coaches. EDW0038, Ver-1.0

 

COACH ALTERATIONS INSTRUCTIONS

SNo.
Description
Document No.
1 Segregation of 110V DC (+ve & -ve) at all levels and provision of Cage Clamp Terminals with glass fuses for enhanced fire safety in LHB EOG AC 2T & 3T Coaches. ED/CAI/033
2 Segregation of 110V DC (+ve & -ve) at all levels and provision of Cage Clamp Terminals with glass fuses for enhanced fire safety in LHB EOG FIRST AC Coaches. ED/CAI/037
3 Segreagation of 110V DC (+ve & -ve) for enhanced fire safety in LHB EOG AC Chair Car & Executive AC Chair Car Coaches. ED/CAI/039
4 Modification of Polyamide conduit Arrangement in Lavatory area of existing LHB EOG AC type coaches. ED/CAI/046