1 |
Inegerated System Procedure for Vendor Registration, Vendor Approval & Vendor Development |
ISP-04 |
3 |
2 |
UIC Rubber Vestibule |
MDST-001 |
0 |
3 |
IRS Side Buffers & Side Buffer for LHB Coaches |
MDST-02 |
0 |
4 |
Schedule of Infrastructural Requirement for Manufacturing and Testing of Natural Fibre Thermoset Composite (NFTC) Sheet |
MDST-003 |
0 |
5 |
Forged Pins |
MDST-04 |
0 |
6 |
Schedule of Infrastructure Requirement for Manufacturing and Testing of Forged Steel Components |
MDST-005 |
0 |
7 |
Schedule of Infrastructural Requirement for Manufacturing and Testing for Steel casting Axle Box Housing |
MDST-014 |
0 |
8 |
Collar, Ring & Retaining ring for direct mounted roller bearing arrgt. |
MDST-019 |
0 |
9 |
Sleeve Complete |
MDST-021 |
0 |
10 |
Center Pivot Pin |
MDST-023 |
0 |
11 |
Schedule of Infrastructural Requirement for Manufacturing and Testing for Stainless Steel Mouldings |
MDST-024 |
0 |
12 |
Schedule of Infrastructural Requirement for Manufacturing and Testing for Roof Ventilator Arrangement (TRA Type) |
MDST-027 |
0 |
13 |
Schedule of Infrastructural Requirement for Manufacturing and Testing for Lifting Pad |
MDST-028 |
0 |
14 |
Schedule of Infrastructural Requirement for Manufacturing and Testing for Water Tank Module |
MDST-031 |
0 |
15 |
Schedule of Infrastructural Requirement for Manufacturing and Testing for Outer Door Assembly (LH & RH) |
MDST-032 |
0 |
16 |
Schedule of Infrastructural Requirement for Manufacturing and Testing for Side Bearer |
MDST-036 |
0 |
17 |
SCHEDULE OF INFRASTRUCTURAL REQUIREMENTS FOR MANUFACTURING & TESTIN G FOR ENTRANCE DOORS FOR LHB DESIGN COACHES |
MDST-037 |
1 |
18 |
Schedule of Infrastructural Requirement for Manufacturing and Testing for Foot Plate Arrangement (UIC Vestibule) |
MDST-038 |
0 |
19 |
Schedule of Infrastructural Requirement for Manufacturing and Testing for Foot Step Arrangement |
MDST-039 |
0 |
20 |
Schedule of Infrastructural Requirement for Manufacturing and Testing for Partition Frames for GS, SLR and AC-3T Coaches |
MDST-040 |
0 |
21 |
Schedule of Infrastructural Requirement for Manufacturing and Testing for Tension Bracket LH and RH |
MDST-041 |
0 |
22 |
Schedule of Infrastructural Requirement for Manufacturing and Testing for Lavatory Pan and Wash Hand Sink |
MDST-044 |
0 |
23 |
Schedule of Infrastructural Requirement for Manufacturing and Testing for Wall Protector |
MDST-045 |
0 |
24 |
Schedule of Infrastructural Requirement for Manufacturing and Testing for Luggage Rack for SLR Coaches |
MDST-046 |
0 |
25 |
Schedule of Infrastructure Requirement for Stainless Steel Fabricated Items |
MDST-102 |
3 |
26 |
Schedule of Infrastructure for Single Bite Type fitting |
MDST-108 |
1 |
27 |
Schedule of Infrastructural Requirement for Flange joint fitting used in Conventional Coaches |
MDST-110 |
1 |
28 |
Schedule of Infrastructure Requirement for Honeycomb Partition Frame Manufacturing |
MDST-111 |
0 |
29 |
Fuel tank for LHB Power Car |
MDST-134 |
0 |
30 |
Air Duct for LHB AC Coaches |
MDST-135 |
0 |
31 |
Sliding door for LHB Passengers Coaches |
MDST-136 |
0 |
32 |
All tpes of Aluminium Water Tanks (Two piece Design) |
MDST-137 |
0 |
33 |
All types of windows for LHB AC Coaches including Hooper window |
MDST-138 |
1 |
34 |
FRP Side wall, Ceiling Panel & Lavatory Module |
MDST-139 |
0 |
35 |
Battery Box for AC/Non-AC Coaches |
MDST-140 |
0 |
36 |
Stainless Steel Battery Box |
MDST-141 |
0 |
37 |
Side Bearer |
MDST-142 |
0 |
38 |
AC trough for Conventional Coaches |
MDST-143 |
0 |
39 |
End construction for conventional coaches |
MDST-144 |
0 |
40 |
Outer door assembly(fabricated) |
MDST_145 |
0 |
41 |
Partition frame made of MS tubes |
MDST-146 |
0 |
42 |
Safety Wire Rope Assembly |
MDST-147 |
0 |
43 |
Spring Dome |
MDST-148 |
0 |
44 |
Spring Pot
|
MDST-149 |
0 |
45 |
Brake Head |
MDST-150 |
0 |
46 |
Lower Spring Seat for Axle Box Guide Arggt. |
MDST-151 |
0 |
47 |
Centering Disc & Brake Sopport |
MDST-153 |
1 |
48 |
Anti Roll Bar |
MDST-154 |
0 |
49 |
Roll Link, Anti Roll bar Fork & Traction Center |
MDST-155 |
0 |
50 |
Front & rear aluminium covers |
MDST-156 |
0 |
51 |
Wearing Piece for conventional coaches |
MDST-157 |
0 |
52 |
Luaggage rack Module for LHB Chair Car Coaches |
MDST-158 |
0 |
53 |
All types of Stainless steel chair pillar assembly |
MDST-159 |
0 |
54 |
False ceiling arrgt. of Non-AC area of LHB Coaches |
MDST-160 |
0 |
55 |
Seat & Berth for LHB and Conventional Coaches |
MDST-161 |
0 |
56 |
All types of window glass arrgt. for AC conventional coaches |
MDST-163 |
0 |
57 |
Hand Brake Arrgt. for coaches |
MDST-165 |
0 |
58 |
Equalising stay for LS beam |
MDST-166 |
0 |
59 |
Brake Beam Complete for conventional coach |
MDST-167 |
0 |
60 |
Assembly of guide on bogie frame |
MDST-168 |
0 |
61 |
SCHEDULE OF INFRASTRUCTURAL REQUIREMENTS FOR MANUFACTURING & TESTING FOR SLIDING DOOR OF LUGGAGE ROOM |
MDST-177 |
0 |
62 |
SGCI Casting of Control Arm Top and control arm lower LH & RH |
MDTS-239 |
1 |
63 |
SGCI Casting & Machining of Control Arm TOPand Control Arm Lower LH & RH for FIAT type bogie |
MDTS-241 |
2 |
64 |
Approved M & P for Trade Group 0036 |
0036 |
0 |
65 |
Approved M&P for Air Vent |
Air Vent |
0 |
66 |
Approved M&P for Aluminium Extrusion |
Aluminium Extrusion |
0 |
67 |
Approved M&P for Aluminium Pillar Assembly and Set of Seat Attachment Profile |
Aluminium Pillar Assembly & Set of Seat Attachment Profile |
0 |
68 |
Approved M&P for Bogie Frame for MEMU Coaches |
Bogie Frame for MEMU |
0 |
69 |
Approved M&P for Bracket Complete |
Bracket Complete |
0 |
70 |
Approved M&P for Cabin Mirror |
Cabin Mirror |
0 |
71 |
Approved M&P for Cable Duct |
Cable Duct |
0 |
72 |
Approved M&P for Centering Disc_Casting_PL 33500083 & 33500174 |
Centering Disc Casting |
0 |
73 |
Approved M&P for Centering Disc_Forging_PL 33500605 |
Centering Disc Forging |
0 |
74 |
Approved M&P for Collapsible Door |
Collapsible Door |
0 |
75 |
Approved M&P for Entrance Hand Rail |
Entrance Hand Rail |
0 |
76 |
Approved M&P for Euro Bowl |
Euro Bowl |
0 |
77 |
Approved M&P for Fixation Ball Joint Rubber |
Ball Joint Rubber |
0 |
78 |
Approved M&P for Fixing Arrangement of Almirah |
Fixing Arrangement |
0 |
79 |
Approved M&P for Floor End Profile |
Floor End Profile |
0 |
80 |
Approved M&P for Front Sheet |
Front Sheet |
0 |
81 |
Approved M&P for Gangway Bridge Mounting |
Gangway Bridge Mounting |
0 |
82 |
Approved M&P for Ladder |
Ladder |
0 |
83 |
Approved M&P for Lavatory Pan Orient Type |
Lavatory Pan Orient Type |
0 |
84 |
Approved M&P for Lavatory Pan |
Lavatory Pan |
0 |
85 |
Approved M&P for Pad for Secondary Suspension |
Pad for Secondary Suspension |
0 |
86 |
Approved M&P for Pillar |
Pillar |
0 |
87 |
Approved M&P for Pipes |
Pipes |
0 |
88 |
Approved M&P for Roof Arch |
Roof Arch |
0 |
89 |
Approved M&P for Rubber Metal Bpnded Items |
Rubber Metal Bpnded Items |
0 |
90 |
Approved M&P for Roof Flange |
Roof Flange |
0 |
91 |
Approved M&P for S S Luggage Rack |
S S Luggage Rack |
0 |
92 |
Approved M&P for S S Step Complete |
S S Step Complete |
0 |
93 |
Approved M&P for Set of Chair Angle |
Set of Chair Angle |
0 |
94 |
Approved M&P for Set of Channel Assembly |
Set of Channel Assembly |
0 |
95 |
Approved M&P for Set of Console |
Set of Console |
0 |
96 |
Approved M&P for Set of Door Cut Out |
Set of Door Cut Out |
0 |
97 |
Approved M&P for Set of Door Flap Panel for Linen Room |
Set of Door Flap Panel for Linen Room |
0 |
98 |
Approved M&P for Set of Fabricated Items |
Set of Fabricated Items |
0 |
99 |
Approved M&P for Set of Floor Plate |
Set of Floor Plate |
0 |
100 |
Approved M&P for Set of Member Complete |
Set of Member Complete |
0 |
101 |
Approved M&P for Set of Mounting Frame for Compartment Swing Door |
Set of Mounting Frame for Compartment Swing Door |
0 |
102 |
Approved M&P for Set of Roof Panel & End Wall Panel |
Set of Roof Panel & End Wall Panel |
0 |
103 |
Approved M&P for Shim |
Shim |
0 |
104 |
Approved M&P for Snack Table |
Snack Table |
0 |
105 |
Approved M&P for Transition Duct |
Transition Duct |
0 |
106 |
Approved M&P for Upper Frame Complete for 450 Litre Water Tank |
Upper Frame Complete for 450 Litre Water Tank |
0 |
107 |
Approved M&P for Stainless Steel T M Duct |
Stainless Steel T M Duct |
0 |
108 |
Approved M&P for Stainless Steel Chequered Sheet |
Stainless Steel Chequered Sheet |
0 |
109 |
Approved M&P for Cross Section |
Cross Section |
0 |