STR and ISP-04 for Mech. Item


SNo.
Description
Document No.
Rev.
 1  Inegerated System Procedure for Vendor Registration, Vendor     Approval & Vendor Development ISP-04  3
2 UIC Rubber Vestibule MDST-001 0
3 IRS Side Buffers & Side Buffer for LHB Coaches MDST-02  0
4 Schedule of Infrastructural Requirement for Manufacturing and Testing   of Natural Fibre Thermoset Composite (NFTC) Sheet MDST-003 0
5  Forged Pins MDST-04  0
6 Schedule of Infrastructure Requirement for Manufacturing and Testing   of Forged Steel Components MDST-005 0
7 Schedule of Infrastructural Requirement for Manufacturing and Testing   for Steel casting Axle Box Housing MDST-014 0
8  Collar, Ring & Retaining ring for direct mounted roller bearing arrgt. MDST-019  0
9 Sleeve Complete MDST-021  0
10 Center Pivot Pin MDST-023 0
11  Schedule of Infrastructural Requirement for Manufacturing and Testing   for Stainless Steel Mouldings MDST-024 0
12 Schedule of Infrastructural Requirement for Manufacturing and Testing   for Roof Ventilator Arrangement (TRA Type) MDST-027 0
13  Schedule of Infrastructural Requirement for Manufacturing and Testing   for Lifting Pad MDST-028 0
14 Schedule of Infrastructural Requirement for Manufacturing and Testing   for Water Tank Module MDST-031 0
15  Schedule of Infrastructural Requirement for Manufacturing and Testing   for Outer Door Assembly (LH & RH) MDST-032 0
16  Schedule of Infrastructural Requirement for Manufacturing and Testing   for Side Bearer MDST-036 0
17 SCHEDULE OF INFRASTRUCTURAL REQUIREMENTS FOR MANUFACTURING & TESTIN G FOR ENTRANCE DOORS FOR LHB DESIGN COACHES  MDST-037 1
18 Schedule of Infrastructural Requirement for Manufacturing and Testing   for Foot Plate Arrangement (UIC Vestibule) MDST-038 0
19 Schedule of Infrastructural Requirement for Manufacturing and Testing   for Foot Step Arrangement MDST-039 0
20  Schedule of Infrastructural Requirement for Manufacturing and Testing   for Partition Frames for GS, SLR and AC-3T Coaches MDST-040 0
21 Schedule of Infrastructural Requirement for Manufacturing and Testing   for Tension Bracket LH and RH MDST-041 0
22  Schedule of Infrastructural Requirement for Manufacturing and Testing   for Lavatory Pan and Wash Hand Sink MDST-044 0
23 Schedule of Infrastructural Requirement for Manufacturing and Testing   for Wall Protector MDST-045 0
24  Schedule of Infrastructural Requirement for Manufacturing and Testing   for Luggage Rack for SLR Coaches MDST-046 0
25 Schedule of Infrastructure Requirement for Stainless Steel Fabricated   Items MDST-102 3
26 Schedule of Infrastructure for Single Bite Type fitting MDST-108 1
27 Schedule of Infrastructural Requirement for Flange joint fitting used in Conventional Coaches MDST-110 1
28 Schedule of Infrastructure Requirement for Honeycomb Partition   Frame   Manufacturing MDST-111 0
29 Fuel tank for LHB Power Car MDST-134 0
30  Air Duct for LHB AC Coaches  MDST-135 0
31 Sliding door for LHB Passengers Coaches MDST-136  0
32 All tpes of Aluminium Water Tanks (Two piece Design) MDST-137 0
33  All types of windows for LHB AC Coaches including Hooper window  MDST-138  1
34  FRP Side wall, Ceiling Panel & Lavatory Module MDST-139 0
35 Battery Box for AC/Non-AC Coaches  MDST-140  0
36 Stainless Steel Battery Box  MDST-141  0
37  Side Bearer MDST-142  0
38  AC trough for Conventional Coaches MDST-143  0
39  End construction for conventional coaches MDST-144 0
40 Outer door assembly(fabricated) MDST_145  0
41 Partition frame made of MS tubes  MDST-146  0
42  Safety Wire Rope Assembly MDST-147 0
43  Spring Dome MDST-148 0
44

 Spring Pot

MDST-149  0
45  Brake Head MDST-150 0
46  Lower Spring Seat for Axle Box Guide Arggt. MDST-151 0
47  Centering Disc &  Brake Sopport MDST-153  1
48 Anti Roll Bar  MDST-154 0
49 Roll Link, Anti Roll bar Fork & Traction Center MDST-155  0
 50 Front & rear aluminium covers MDST-156  0
51 Wearing Piece for conventional coaches MDST-157  0
 52 Luaggage rack Module for LHB Chair Car Coaches MDST-158 0
53 All types of Stainless steel chair pillar assembly  MDST-159  0
54 False ceiling arrgt. of Non-AC area of LHB Coaches MDST-160 0
55 Seat & Berth for LHB and Conventional Coaches MDST-161 0
56  All types of window glass arrgt. for AC conventional coaches MDST-163 0
57 Hand Brake Arrgt. for coaches MDST-165  0 
 58  Equalising stay for LS beam MDST-166   0 
59 Brake Beam Complete for conventional coach MDST-167  0
 60 Assembly of guide on bogie frame MDST-168 0
61 SCHEDULE OF INFRASTRUCTURAL REQUIREMENTS FOR MANUFACTURING & TESTING FOR SLIDING DOOR OF LUGGAGE ROOM  MDST-177 0
62  SGCI Casting of Control  Arm Top and control arm lower LH & RH MDTS-239 1
63  SGCI Casting & Machining of Control Arm TOPand Control Arm Lower   LH & RH for FIAT type bogie MDTS-241 2
64  Approved M & P for Trade Group 0036 0036 0
65  Approved M&P for Air Vent Air Vent 0
66  Approved M&P for Aluminium Extrusion Aluminium Extrusion 0
67  Approved M&P for Aluminium Pillar Assembly and Set of Seat   Attachment Profile Aluminium Pillar Assembly & Set of Seat Attachment Profile 0
68  Approved M&P for Bogie Frame for MEMU Coaches Bogie Frame for MEMU 0
69  Approved M&P for Bracket Complete Bracket Complete 0
70  Approved M&P for Cabin Mirror Cabin Mirror 0
71  Approved M&P for Cable Duct Cable Duct 0
72  Approved M&P for Centering Disc_Casting_PL 33500083 & 33500174 Centering Disc Casting 0
73  Approved M&P for Centering Disc_Forging_PL 33500605 Centering Disc Forging 0
74  Approved M&P for Collapsible Door Collapsible Door 0
75  Approved M&P for Entrance Hand Rail Entrance Hand Rail 0
76  Approved M&P for Euro Bowl Euro Bowl 0
77  Approved M&P for Fixation Ball Joint Rubber Ball Joint Rubber 0
78  Approved M&P for Fixing Arrangement of Almirah Fixing Arrangement 0
79  Approved M&P for Floor End Profile Floor End Profile 0
80  Approved M&P for Front Sheet Front Sheet 0
81  Approved M&P for Gangway Bridge Mounting  Gangway Bridge Mounting 0
82  Approved M&P for Ladder Ladder 0
83  Approved M&P for Lavatory Pan Orient Type Lavatory Pan Orient Type 0
84  Approved M&P for Lavatory Pan Lavatory Pan 0
85  Approved M&P for Pad for Secondary Suspension Pad for Secondary Suspension 0
86  Approved M&P for Pillar Pillar 0
87  Approved M&P for Pipes Pipes 0
88  Approved M&P for Roof Arch Roof Arch 0
89  Approved M&P for Rubber Metal Bpnded Items  Rubber Metal Bpnded Items 0
90  Approved M&P for Roof Flange Roof Flange 0
91  Approved M&P for S S Luggage Rack S S Luggage Rack 0
92  Approved M&P for S S Step Complete S S Step Complete 0
93  Approved M&P for Set of Chair Angle Set of Chair Angle 0
94  Approved M&P for Set of Channel Assembly Set of Channel Assembly 0
95  Approved M&P for Set of Console Set of Console 0
96  Approved M&P for Set of Door Cut Out Set of Door Cut Out 0
97  Approved M&P for Set of Door Flap Panel for Linen Room Set of Door Flap Panel for Linen Room 0
98  Approved M&P for Set of Fabricated Items Set of Fabricated Items 0
99  Approved M&P for Set of Floor Plate Set of Floor Plate 0
100  Approved M&P for Set of Member Complete Set of Member Complete 0
101  Approved M&P for Set of Mounting Frame for Compartment Swing   Door Set of Mounting Frame for Compartment Swing   Door 0
102  Approved M&P for Set of Roof Panel & End Wall Panel Set of Roof Panel & End Wall Panel 0
103  Approved M&P for Shim Shim 0
104  Approved M&P for Snack Table Snack Table 0
105  Approved M&P for Transition Duct Transition Duct 0
106  Approved M&P for Upper Frame Complete for 450 Litre Water Tank Upper Frame Complete for 450 Litre Water Tank 0
107  Approved M&P for Stainless Steel T M Duct Stainless Steel T M Duct 0
108  Approved M&P for Stainless Steel Chequered Sheet Stainless Steel Chequered Sheet 0
109  Approved M&P for Cross Section Cross Section 0

 

 

 

 

 



Source : Welcome to Rail Coach Factory Kapurthala Official Website CMS Team Last Reviewed on: 08-11-2023  

  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.