|
SNo.
|
Description
|
Document No.
|
Rev.
|
| 1 | Inegerated System Procedure for Vendor Registration, Vendor Approval & Vendor Development | ISP-04 | 3 |
| 2 | UIC Rubber Vestibule | MDST-001 | 0 |
| 3 | IRS Side Buffers & Side Buffer for LHB Coaches | MDST-02 | 0 |
| 4 | Schedule of Infrastructural Requirement for Manufacturing and Testing of Natural Fibre Thermoset Composite (NFTC) Sheet | MDST-003 | 0 |
| 5 | Forged Pins | MDST-04 | 0 |
| 6 | Schedule of Infrastructure Requirement for Manufacturing and Testing of Forged Steel Components | MDST-005 | 0 |
| 7 | Schedule of Infrastructural Requirement for Manufacturing and Testing for Steel casting Axle Box Housing | MDST-014 | 0 |
| 8 | Collar, Ring & Retaining ring for direct mounted roller bearing arrgt. | MDST-019 | 0 |
| 9 | Sleeve Complete | MDST-021 | 0 |
| 10 | Center Pivot Pin | MDST-023 | 0 |
| 11 | Schedule of Infrastructural Requirement for Manufacturing and Testing for Stainless Steel Mouldings | MDST-024 | 0 |
| 12 | Schedule of Infrastructural Requirement for Manufacturing and Testing for Roof Ventilator Arrangement (TRA Type) | MDST-027 | 0 |
| 13 | Schedule of Infrastructural Requirement for Manufacturing and Testing for Lifting Pad | MDST-028 | 0 |
| 14 | Schedule of Infrastructural Requirement for Manufacturing and Testing for Water Tank Module | MDST-031 | 0 |
| 15 | Schedule of Infrastructural Requirement for Manufacturing and Testing for Outer Door Assembly (LH & RH) | MDST-032 | 0 |
| 16 | Schedule of Infrastructural Requirement for Manufacturing and Testing for Side Bearer | MDST-036 | 0 |
| 17 | SCHEDULE OF INFRASTRUCTURAL REQUIREMENTS FOR MANUFACTURING & TESTIN G FOR ENTRANCE DOORS FOR LHB DESIGN COACHES | MDST-037 | 1 |
| 18 | Schedule of Infrastructural Requirement for Manufacturing and Testing for Foot Plate Arrangement (UIC Vestibule) | MDST-038 | 0 |
| 19 | Schedule of Infrastructural Requirement for Manufacturing and Testing for Foot Step Arrangement | MDST-039 | 0 |
| 20 | Schedule of Infrastructural Requirement for Manufacturing and Testing for Partition Frames for GS, SLR and AC-3T Coaches | MDST-040 | 0 |
| 21 | Schedule of Infrastructural Requirement for Manufacturing and Testing for Tension Bracket LH and RH | MDST-041 | 0 |
| 22 | Schedule of Infrastructural Requirement for Manufacturing and Testing for Lavatory Pan and Wash Hand Sink | MDST-044 | 0 |
| 23 | Schedule of Infrastructural Requirement for Manufacturing and Testing for Wall Protector | MDST-045 | 0 |
| 24 | Schedule of Infrastructural Requirement for Manufacturing and Testing for Luggage Rack for SLR Coaches | MDST-046 | 0 |
| 25 | Schedule of Infrastructure Requirement for Stainless Steel Fabricated Items | MDST-102 | 5 |
| 26 | Schedule of Infrastructure for Single Bite Type fitting | MDST-108 | 1 |
| 27 | Schedule of Infrastructure for Single Bite Type Fitting | Corrigendum of MDST-108 | 1 |
| 28 | Schedule of Infrastructural Requirement for Flange joint fitting used in Conventional Coaches | MDST-110 | 1 |
| 29 | Schedule of Infrastructure Requirement for Honeycomb Partition Frame Manufacturing | MDST-111 | 0 |
| 30 | Fuel tank for LHB Power Car | MDST-134 | 0 |
| 31 | Air Duct for LHB AC Coaches | MDST-135 | 0 |
| 32 | Sliding door for LHB Passengers Coaches | MDST-136 | 0 |
| 33 | All tpes of Aluminium Water Tanks (Two piece Design) | MDST-137 | 0 |
| 34 | All types of windows for LHB AC Coaches including Hooper window | MDST-138 | 1 |
| 35 | FRP Side wall, Ceiling Panel & Lavatory Module | MDST-139 | 0 |
| 36 | Battery Box for AC/Non-AC Coaches | MDST-140 | 0 |
| 37 | Stainless Steel Battery Box | MDST-141 | 1 |
| 38 | Side Bearer | MDST-142 | 0 |
| 39 | AC trough for Conventional Coaches | MDST-143 | 0 |
| 40 | End construction for conventional coaches | MDST-144 | 0 |
| 41 | Outer door assembly(fabricated) | MDST_145 | 0 |
| 42 | Partition frame made of MS tubes | MDST-146 | 0 |
| 43 | Safety Wire Rope Assembly | MDST-147 | 0 |
| 44 | Spring Dome | MDST-148 | 0 |
| 45 |
Spring Pot |
MDST-149 | 0 |
| 46 | Brake Head | MDST-150 | 0 |
| 47 | Lower Spring Seat for Axle Box Guide Arggt. | MDST-151 | 0 |
| 58 | Centering Disc & Brake Sopport | MDST-153 | 1 |
| 59 | Anti Roll Bar | MDST-154 | 0 |
| 50 | Roll Link, Anti Roll bar Fork & Traction Center | MDST-155 | 0 |
| 51 | Front & rear aluminium covers | MDST-156 | 0 |
| 52 | Wearing Piece for conventional coaches | MDST-157 | 0 |
| 53 | Luaggage rack Module for LHB Chair Car Coaches | MDST-158 | 0 |
| 54 | All types of Stainless steel chair pillar assembly | MDST-159 | 1 |
| 55 | False ceiling arrgt. of Non-AC area of LHB Coaches | MDST-160 | 0 |
| 56 | Seat & Berth for LHB and Conventional Coaches | MDST-161 | 0 |
| 57 | All types of window glass arrgt. for AC conventional coaches | MDST-163 | 0 |
| 58 | Hand Brake Arrgt. for coaches | MDST-165 | 0 |
| 59 | Equalising stay for LS beam | MDST-166 | 0 |
| 60 | Brake Beam Complete for conventional coach | MDST-167 | 0 |
| 61 | Assembly of guide on bogie frame | MDST-168 | 0 |
| 62 | SCHEDULE OF INFRASTRUCTURAL REQUIREMENTS FOR MANUFACTURING & TESTING FOR SLIDING DOOR OF LUGGAGE ROOM | MDST-177 | 0 |
| 63 | Schedule of technical requirements for set of Control Arm Support Left & Reight for LHB Bogie PL No 33504520 | MDST-186 | 0 |
| 64 |
Schedule of Infra-Structural requirements for manufacturing & Testing of Fire Retardant Fibre Glass Wool with Single side Heat Resistant Aluminium Foil for Heat Insulation in IR Coaches.
|
MDST-189 | 0 |
| 65 | Approved M & P for Trade Group 0036 | 0036 | 0 |
| 66 | Approved M&P for Air Vent | Air Vent | 0 |
| 67 | Approved M&P for Aluminium Extrusion | Aluminium Extrusion | 0 |
| 68 | Approved M&P for Aluminium Pillar Assembly and Set of Seat Attachment Profile | Aluminium Pillar Assembly & Set of Seat Attachment Profile | 0 |
| 69 | Approved M&P for Bogie Frame for MEMU Coaches | Bogie Frame for MEMU | 0 |
| 70 | Approved M&P for Bracket Complete | Bracket Complete | 0 |
| 71 | Approved M&P for Cabin Mirror | Cabin Mirror | 0 |
| 72 | Approved M&P for Cable Duct | Cable Duct | 0 |
| 73 | Approved M&P for Centering Disc_Casting_PL 33500083 & 33500174 | Centering Disc Casting | 0 |
| 74 | Approved M&P for Centering Disc_Forging_PL 33500605 | Centering Disc Forging | 0 |
| 75 | Approved M&P for Collapsible Door | Collapsible Door | 0 |
| 76 | Approved M&P for Entrance Hand Rail | Entrance Hand Rail | 0 |
| 77 | Approved M&P for Euro Bowl | Euro Bowl | 0 |
| 78 | Approved M&P for Fixation Ball Joint Rubber | Ball Joint Rubber | 0 |
| 79 | Approved M&P for Fixing Arrangement of Almirah | Fixing Arrangement | 0 |
| 80 | Approved M&P for Floor End Profile | Floor End Profile | 0 |
| 81 | Approved M&P for Front Sheet | Front Sheet | 0 |
| 82 | Approved M&P for Gangway Bridge Mounting | Gangway Bridge Mounting | 0 |
| 83 | Approved M&P for Ladder | Ladder | 0 |
| 84 | Approved M&P for Lavatory Pan Orient Type | Lavatory Pan Orient Type | 0 |
| 85 | Approved M&P for Lavatory Pan | Lavatory Pan | 0 |
| 86 | Approved M&P for Pad for Secondary Suspension | Pad for Secondary Suspension | 0 |
| 87 | Approved M&P for Pillar | Pillar | 0 |
| 88 | Approved M&P for Pipes | Pipes | 0 |
| 88 | Approved M&P for Roof Arch | Roof Arch | 0 |
| 90 | Approved M&P for Rubber Metal Bpnded Items | Rubber Metal Bpnded Items | 0 |
| 91 | Approved M&P for Roof Flange | Roof Flange | 0 |
| 92 | Approved M&P for S S Luggage Rack | S S Luggage Rack | 0 |
| 93 | Approved M&P for S S Step Complete | S S Step Complete | 0 |
| 94 | Approved M&P for Set of Chair Angle | Set of Chair Angle | 0 |
| 95 | Approved M&P for Set of Channel Assembly | Set of Channel Assembly | 0 |
| 96 | Approved M&P for Set of Console | Set of Console | 0 |
| 97 | Approved M&P for Set of Door Cut Out | Set of Door Cut Out | 0 |
| 98 | Approved M&P for Set of Door Flap Panel for Linen Room | Set of Door Flap Panel for Linen Room | 0 |
| 99 | Approved M&P for Set of Fabricated Items | Set of Fabricated Items | 0 |
| 100 | Approved M&P for Set of Floor Plate | Set of Floor Plate | 0 |
| 101 | Approved M&P for Set of Member Complete | Set of Member Complete | 0 |
| 102 | Approved M&P for Set of Mounting Frame for Compartment Swing Door | Set of Mounting Frame for Compartment Swing Door | 0 |
| 103 | Approved M&P for Set of Roof Panel & End Wall Panel | Set of Roof Panel & End Wall Panel | 0 |
| 104 | Approved M&P for Shim | Shim | 0 |
| 105 | Approved M&P for Snack Table | Snack Table | 0 |
| 106 | Approved M&P for Transition Duct | Transition Duct | 0 |
| 107 | Approved M&P for Upper Frame Complete for 450 Litre Water Tank | Upper Frame Complete for 450 Litre Water Tank | 0 |
| 108 | Approved M&P for Stainless Steel T M Duct | Stainless Steel T M Duct | 0 |
| 109 | Approved M&P for Stainless Steel Chequered Sheet | Stainless Steel Chequered Sheet | 0 |
| 110 | Approved M&P for Cross Section | Cross Section | 0 |

Accessibility Controls